Railway Approach at London Bridge

London Bridge Scaffolding and Asbestos Removal

Railway Approach (London Bridge) project successfully wrapped up for our valued client Bam Nuttall, as part of the CP6 framework.

Our scaffold solution enabled safe asbestos removal that will be carried out internally by our asbestos team, followed by UHP blasting and precision paintwork.

The scaffold itself spans an impressive 25 meters with a 3-lift hanging scaffold. Our team ensured it was erected to the highest standards. Not to forget the great design by PSD Prime Scaffold & Structural Designs Limited that made it all possible.

London Bridge Asbestos Removal
Scaffold Solution London Bridge

We are proud to be part of this project, where our scaffold solution enables safe asbestos removal and underscores our commitment to in-house expertise

 