Critical safety maintenance works to the A40 Westway Flyover at Shepherd’s Bush posed unique challenges for Alltask. We worked with UK System Scaffold Hire Ltd (UKSSH) and Prime Scaffold and Structural Designs
Read more
The Manbre Wharf redevelopment project, situated on the banks of the River Thames, is a significant redevelopment aimed at transforming the area into a modern, state-of-the-art workspace. Upon completion, the site
Read more
Alltask was engaged to undertake essential refurbishment work at AP Academy, a flagship secondary school in the London Borough of Hammersmith and Fulham.The academy specializes in supporting students
Read more
Alltask was commissioned by DBR to undertake a highly challenging scaffolding project at the Natural History Museum. The project involved the installation of two rolling access birdcages to facilitate the repair
Read more
DBR commissioned Alltask to execute a scaffolding project at the Natural History Museum in Tring. The project involved installing a temporary roof over the Rothschild library, accompanied by an internal birdcage scaffold to
Read more
Ridham Dock Biomass Plant, located in the UK, started operations in 2015. The plant uses around 170,000 tonnes of waste wood annually, which was previously exported to the continent. This waste wood is now converted into 23
Read more
We are pleased to announce the completion of St David’s Court in Waltham Forest, one of the two blocks we have worked on for our valued client, Morgan Sindall Property Services. The scaffold, erected by our team
Read more
Alltask proudly partnered with J. Murphy & Sons Ltd to provide scaffolding solutions for the construction of the new main station building at Beaulieu Park Station, part of a significant £124 million contract awarded
Read more
Alltask erected an independent access scaffold with NIKO runway at Cambridge South Station, enabling the installation of glazing panels for the new main station building. This project was undertaken for our client, J. Murphy & Sons Ltd
Read more
The upgrade to Peterborough Compressor Station was necessary to reduce noise and vibration at the compressor station, enabling uninterrupted operation without the need for an enclosing structure, which could
Read more
Outstanding teamwork displayed during the Easter weekend by the Alltask team in the striking of the large terrace temporary roof, its supporting structures, and the water management system on Marylebone Road, all of which
Read more
Great photo of our scaffolding at Westminster Bridge!
Our team has expertly erected the scaffolding to provide access for the essential repair work on the arch rib. We are proud to assist our valued client,
Read more
Alltask undertakes a significant project for client ISG Retail Limited, involving the complete internal refurbishment of a large Lloyds Banking office block.
The project, which commenced in December 2023, encompasses
Read more
Alltask has worked for our valued client Kier Construction Limited on a prestigious £69 million commercial development at 135 Park Street in Southbank, London SE1.
This Grade A refurbishment project aims to provide
Read more
Alltask provided scaffolding services for our valued client ISG Construction Limited, who secured a £50 million project to redevelop and refurbish the old Woolworths headquarters on Marylebone Road in London.
Read more
Alltask provided a weatherproof encapsulation scaffold solution for cable joiners tasked with installing sealing end cables at a new pylon tower. This case study highlights how Alltask’s expertise, nationwide coverage, and
Read more
Luton Station serves as a vital transportation hub, which required the replacement of the canopies on Platforms 1 and 2. JSS Rail managed the project, and PSD undertook the design work. The primary objective was to facilitate the
Read more
As part of the NHS Bedfordshire Hospitals Site Redevelopment, KIER Construction undertook the construction of new clinical buildings at Luton & Dunstable Hospital. The project, aimed to deliver two
Read more
Alltask is proud to have worked in collaboration with BAM UK & Ireland and PSD Prime Scaffold and Structural Designs Limited to complete these projects in Borough Market, Railway Approach, and Clink Street.
Read more
Riverlinx CJV, on behalf of Transport for London, are building a new twin-bore road tunnel under the Thames linking the Greenwich Peninsula to Newham. The road tunnel will be 1.4km long with two lanes in each direction.
Read more
At Alltask, we take immense pride in contributing to the art of winemaking by optimising the fermentation process through advanced thermal insulation solutions.
Linking Fermentation & Thermal Insulation:
Wine enthusiasts often
Read more
The project involves installing a waterproof Mega Tent, an overhead gantry crane, and steelwork for upgrades to the road above Platforms 11 and 12 to remove road support beams that are over 100 years old. The project
Read more
Our recently completed beamed access scaffolding on Viaduct Road in Chelmsford, for our valued client J. Murphy & Sons Limited.
This scaffolding was erected to provide high-level access for the installation of new services
Read more
Railway Approach (London Bridge) project successfully wrapped up for our valued client Bam Nuttall, as part of the CP6 framework.
Our scaffold solution enabled safe asbestos removal that will be carried out internally by our
Read more
Alltask’s scaffold design journey with Prime Scaffold and Structural Designs Limited (PSD) and our client, Octavius Infrastructure Ltd (OIL), began in PACE 2 in 2020 under an Early Contractor Involvement Contract (ECI).
Read more
Alltask are providing ongoing support for our client Octavius Infrastructure Ltd (OIL) as part of their brick and stonework repair and restoration scheme to arches 3-8 of the Grade II listed Ouse Valley Viaduct, in Haywards
Read more
Alltask provided scaffolding services for the installation of high-definition passenger information screens at London Euston station. The objective of this project was to enhance the passenger experience and modernise
Read more
Working with SCS JV to deliver the London Tunnels programme for HS2, we have designed and installed a massive temporary roof structure to protect a number of storage areas known as TBM Arisings Storage Bins
Read more
Our client DBR Limited, a renowned heritage restoration and conservation company, has been awarded the project to undertake the conservation cleaning and repair of Marble Arch. This iconic landmark
Read more
Our recently completed scaffolding project at London Paddington Railway Station involved installing a waterproof Mega Tent, an overhead gantry crane, and steelwork for upgrades to the road about
Read more
We have completed the Embankment Protection Deck and Site Access Staircase at Bewl Water for our client Knights Brown
Designed by PSD Scaffold Design and erected by our scaffolding team, the project has
Read more
We have successfully completed the TBM Arisings Storage Bins 1, 2 and 3 as part of the London Tunnels programme for HS2, and it wouldn't have been possible without the efforts of our scaffolding team!
Read more
Photos showcasing our recent completed construction of a temporary pedestrian access ramp scaffolding at Silvertown tunnel for our valued client Riverlinx.
The structure was erected entirely using HAKI universal system
Read more
Our Rail Division recently completed the successful construction of a temporary pedestrian access platform scaffolding at Honeybourne Station, fulfilling the specific requirements of our client JSS Rail,
Read more
Tooting Station's week 5 abnormal possession was a success for our Rail Division and our valued client BAM Nuttall Ltd. We installed a 10kn/m2 site access bridge complete with 1000kg lifting frames to assist our
Read more
We have successfully erected sealing ends across three different sites, at Warley Grid, Maldon Grid, and Shenfield Grid for our client Morrisons Utility Services.
All scaffolds were designed by our
Read more
Alltask Ltd, have provided access and protection for a major restoration project on Chichester Cathedral’s timber roof. The Cathedral’s roof is of historical and architectural significance. Dating back to medieval times,
Read more
The historic Kingston Bridge is a road bridge at Kingston upon Thames in south west London, which carries the major A308 commuter route across the River Thames.
It joins the town centre of Kingston in the Royal
Read more
In late 2022 and the first quarter of 2023, major maintenance work was carried out on the Isle of Wight’s historic Ryde Pier. The 600+ metre long, Grade II listed pier is over 200 years old and provides a major link between the Isle of Wight
Read more
Photos showcasing our recent week 28 possession works at Streatham Station for our valued client. Our works were part of The Access for All Programme to improve accessibility routes at railway stations. We delivered a fully
Read more
Images of two heavy-duty free-standing scaffolds erected at the Royal Sussex County Hospital. Designed and built to support two MRI Scanners weighing 3 tonnes each which were lifted into place using a 450-tonne
Read more
Photo’s showcasing the final and the largest phase of the major roof restoration at the Nave at Chichester Cathedral. The roofs have been leaking for many years, but the new roof will provide better protection from coastal weather and
Read more
Buildings usually require external refurbishment at one point or another and, in order to allow this to happen, expert scaffolding contractors are often called in at the start of the project to provide the access needed.
Read more
Iconic landmarks and historic buildings all require some level of repair at some point in their lives. But, when this important renovation work means the need for them to be covered in large amounts of scaffolding and sheeting,
Read more
Crowborough and East Grinstead Stations are part of the UK Southern Rail Region, and both recently underwent multi-million pound Network Rail upgrades to improve accessibility routes to and between platforms.
Read more
Asbestos insulating board debris was identified during a refurbishment and demolition survey of a Grade II listed public house in a rural part of the Sevenoaks district of Kent. Asbestos was found beneath floorboards on the first and second floors
Read more
Iconic landmarks and historic buildings all require some level of repair at some point in their lives. But, when this important renovation work means the need for them to be covered in large amounts of scaffolding and sheeting,
Read more
Kemsley Mill has an annual production capacity of around 800,000 tonnes and is the second biggest recovered fiber-based paper operation in Europe. DS Smith invested over £100m to purchase and rebuild PM6 to
Read more
As part of Connect Plus’s ongoing maintenance & inspection of all assets on the M25, Alltask were engaged to provide access to a series of high-level inspection hatches. As the scheme evolved, our client requested some
Read more
CITB is the Industry Training Board and a partner in the Sector Skills Council for the construction industry in England, Scotland, and Wales. CITB National Construction College is the largest construction college in
Read more